PROJECT: US Capitol Building
LOCATION: Washington D.C.
Design/Build project consisting of building a redundant fiber ring between twelve buildings, and thirty-seven TR closets. Project consisted of 25,000 APC fusion fiber splices. Installed intelligent IPATCH system. Project was completed and registered for the Commscope Systimax 25 year warranty. |
|
|
 |
|
 |
 |
|
 |
|
 |
PROJECT: Visitors Quarters
LOCATION: Andrews Air Force Base
This project consisted of upgrading the OSP infrastructure cabling to support the new Visitors Quarters, as well as additional buildings currently being built and for future provisioning. This required that we install a new 3600 pair Cat3 OSP cable 4500 feet between nine manholes splicing. Provided AutoCAD As-Built and tested all cables and provided test results using a Fluke DTX tester. Project was registered for a Hubbell/Mohawk 25 year warranty assurance. Project completion was achieved in six months. |
|
|
 |
|
 |
 |
|
 |
|
 |
PROJECT: MSG Battalion
LOCATION: Quantico, VA
Installed an inside/outside plant telecommunications system. This project consisted of meeting NMCI requirements and standards for the installation of secured networks. Provided a Hubbell/Mohawk 25 year warranty assurance. This project was a Design/Build that was completed in four months. |
|
|
 |
|
 |
 |
|
 |
|
 |
PROJECT: Rader Medical Center
LOCATION: Fort Myer, VA
Installed a forty-two speaker paging system and thirty-two card access control system. Installed a structured cabling system consisting of Cat6 plenum cabling between three floors. This project was a completed renovation of all three floors. Provided onsite training on the paging and card access system to end user. Provided a manufacturer system assurance warranty. |
|
|
 |
|
 |
 |
|
 |
|
 |
PROJECT: Extension of Fiber Ring
LOCATION: St. Inigoes Webster Field
Provided and installed a new fiber ring around the base between fourteen existing manholes and six new manholes. Requirements included directionally boring eight thousand feet to provide the required pathway to tie in all buildings. Installed a 144-Strand singlemode fiber and spliced in twenty different TYCO splice cases. Provided and installed manhole racks, and tracer blocks in all manholes, grounded all manholes, and provided new manhole lids and security locks for all manholes utilized. |
|
|
 |
|
 |
 |
|
 |
|
 |
PROJECT: Bancroft Hall
LOCATION: US Naval Academy
Provided and installed 2200 Cat6 plenum cables in between two wings to support voice and data networks. All work was to be completed in two months over summer break for the midshipman barracks. Pathways were installed between closets which required seventeen new 4-inch core drills and x-rays. Built out two new IDF closets to support the new Cat6 voice and data cables. This install was to upgrade their current Cat5 cabling system to a Cat6 cabling system to allow for gigabit bandwidth. This project was completed over two months and completed on time. |
|
|
 |
|
 |
 |
|
 |
|
 |
PROJECT: Renovation of Bldg 2006
LOCATION: Quantico, VA
This project was a Design/Build project. This project consisted of two phases: Temporary Trailers and renovation of Building 2006. The temporary trailers consisted of wiring eighteen temporary trailers with a Cat5e cabling system. Installed 3100 Cat6 cables between all closets and installed all ladder rack in all closets. This install was completed in six months. |
|
|
 |
|
 |
|
|
|