Project Description

SERVICE INFORMATION

Quantico, VA
This project consisted of two buildings and construction mandated both buildings be completed concurrently. IET provided the manpower to deliver the project on a tight schedule. MCIOC consisted of seven 2-Strand 50/125 micron fiber cables and two Cat6 copper cables to each of the 260 floor boxes. This building had approximately 8,500 fiber terminations. OSP consisted of a 900-Pair and 300-Pair fiber routed through various manholes across the base. The MCNOSC building consisted of seven Cat6 cables to each of the 280 cubicles. This project was completed on time without delays.